Project Description
Project Location : DP World in Thurrock
Heat Energy Meters Thurrock
Job Spec
Working with First Intervention on installing heat energy meters, helping them to measure the thermal energy. This allows them to monitor their energy consumption allowing them to cut financial costs and help reduce their carbon emissions.
Works included the following:
- Drain down of two Solar Thermal Wet Systems and install a heat energy monitor/meter.
- Cut in meter and return temperature pockets.
- Re-filling the system with virgin thermal transfer fluid with 20% antifreeze.
- Flush of system and re-commissioning